A more detailed agenda will come out as we get closer but the general topics are listed below.
- Brief committee updates
- Slideshow of December 20 site visit
- Beaver dam analog presentations and discussion. Location Selection Models, material/tool alternatives based on accessibility, example projects, potential influence on flow and temperature
- Green River Side Channel work. Model/report overview for Green River site selection, discussion with TU/USFWS Green River staff
- Wild and Scenic eligibility designation discussion- How does being listed as eligible for wild and scenic designation influence potential projects and how could potential projects influence any potential future design for Wild and Scenic designation? What are the pros/cons of official designation?